The Speedline range of channel sections have been designed to form sub grids for supporting any type of
suspended ceiling.
For further assistance please contact [email protected] with details of the Type of Span (single or continuous), Length of Span (in metres) and the Total Weight to be supported from the sub grid (kg/square metre) so that the correct channel size can be calculated for your project.
Channel Connectors are available for SU07 only. For joining all other channels, they must be bolted back to back with a minimum overlap of 600mm. A minimum of two bolts must be used, at 500mm minimum centres.