SPEEDLINE DRYWALL PARTITION SYSTEMS PASS CCPI ASSESSMENT

Speedline Drywall Systems is part of the SIG Group and one of the first drywall systems to pass this assessment. The achievement is just one example of the Group’s continued commitment to demonstrating quality product and system information across own-brand products. SIG has also made significant investment in its compliance team, SIG Assured, which works and supports manufacturers to ensure products are fully compliant with current industry requirements.

The CCPI was developed by the Construction Products Association (CPA) as a means to provide independent third-party assessment of the way product information is provided. Born out of the need for transparency and accuracy, the code checks all claims are clear, accurate, up-to-date, and with supporting documentation that is readily available.

Meeting the CCPI assessment is another positive check for Speedline Drywall Systems, offering customers confidence in the performance claims made in all sales and marketing material as well as technical documentation.

Speaking on the assessment, SIG UK Compliance Director Steve Marr commented: “The work by the CCPI is incredibly valuable for manufacturers and customers alike. It’s a real step forward and encouraging that so many manufacturers are signing up. For SIG, managing product accuracy, and information & regulatory compliance has been a cornerstone of providing reassurances for customers. I’ve worked extensively with manufacturers from within the business and outside on driving this, and it’s great to see the Speedline Drywall Systems achieve this assessment.”

The systems comprise metal stud partitions supplied with performance plasterboard from major UK manufacturers. The products are combined to create a system which provides the performance levels customers need, with the flexibility of working with major plasterboard suppliers.

For more information on Speedline, its products, and systems, visit speedlinedrywall.co.uk

Information Hub All Resources

SIG is pleased to announce their Speedline Partition Systems have passed the assessment against the Code for Construction Product Information (CCPI). *The assessment covers all non-load bearing metal stud partition systems, including shaft wall, with 30-, 60-, 90-, and 120-minute fire resistance.

CCPI

Speedline is totally committed to the concept and future success of supporting BIM (Building Information Modelling).

BIM

The Speedline Drywall Systems manual is a guide to offer you the best dry lining solution for your project utilising the extensive, independently tested range of Speedline Drywall Systems.

Drywall Manual

The manufacturer of the Speedline metal systems has been recognised by the award of BS ISO 14001:2004 for it’s Environmental Management System and the Steel Construction Sustainability Charter and were the first cold roll-forming company to be awarded the prestigious Gold standard.

Sustainability

Speedline metal systems are manufactured in accordance with Occupational Health and Safety management System BS OHSAS 18001:2007

Health & Safety

From the initial concept of your project, we can provide full technical support, including specification advice and provide NBS clauses and specific design details.

Technical Support

Each combination of Speedline metal, plasterboard and insulation has a unique system reference number.  This unique reference number allows you to download all relevant information.

Data Sheets

Correct installation and specification of Speedline Drywall Systems and components is the responsibility of the contractor and design team.  Construction should be in accordance to all relevant regulatory requirements and appropriate UK construction guidance and guidelines.

Standards

Speedline Systems Assurance is a dedicated warranty covering a comprehensive range of drywall solutions, offering peace of mind for clients, specifiers and contractors.

Systems Assurance